| Snarky Muse is a multi-genre roleplaying site with a name inspired by my own jerk of a muse--you probably either know him or one just like him. Click for more... |
| Compound wood floor construction process is how the shop is stuck? | |
|---|---|
| Tweet Topic Started: Aug 19 2015, 12:50 AM (94 Views) | |
| meishengchao | Aug 19 2015, 12:50 AM Post #1 |
|
1, the construction preparation: (1) material: compound wood floor material appropriate chooses wear-resisting, texture clear, glossy, rot resistance, not easy craze, not easy to deformation of the domestic high quality compound wood floor, thickness should comply with the design requirements.(2) specification: usually a bar tongued and grooved.2, base materials: dampproof mat.3, construction program: cement mortar leveling glossy - mat layer of dampproof mat - compound wood floor of compound wood floor board installation.4, construction key points: (1) the surface laying construction: the surface construction mainly include open lath fixed on the surface and surface finishing processing.Fixed way is given priority to with nail fixed.Nail box yuan will surface strip fixed in the concrete surface.(2) the bar of wooden floor laid direction should consider convenient shop nail, fixed firmly, beautiful requirement.For corridor, corridor etc, should be laid down walking direction;The indoor room, should be spread nail down the light.For most of the room, nail down the light shop, peer direction is consistent.(3) faux paint molded composite doors, the article will be the heart wood plank heart put up tight shop nail, gap less than 1 mm, the length of the round nails for the thickness of 2.0 ~ 2.5 times.Drilling should be taken before nailing hardwood of galley, general pore diameter for the pin diameter 0.7 ~ 0.8 times.(4) with nail, the nail method have bright and dark screw on two kinds of method.Ming nailing, flat head of nail down first, will round nails oblique nail into the board, the same lines of the head of nail should be in the same line, and should be the head of nail into 3 ~ 5 mm.Dark nail method, flat head of nail down first, from the edge of the concave Angle, oblique nailing.In the shop, nails, nail and Angle to the surface, usually used 45 or 60 degrees inclined nail. Construction attention: 1, must be in accordance with the requirements of design construction, select materials should comply with the selection criteria.2, wood floor to set aside the 9 mm gap at against the wall, and ventilation.On the floor and skirting board intersect, fancy plastic garden doors, should leave a vent on the wood skirting board.3, solid type wood floor is laid linoleum moistureproof layer must be connected to the wall body moisture barrier.4, in normal temperature conditions, fine stone concrete cushion at least 7 d after watering, before the shop is compound wood floor surface.5, wooden floor laid direction: the direction for the wood floor to light in the room into the laying direction. |
|
|
| 1 user reading this topic (1 Guest and 0 Anonymous) | |
| « Previous Topic · General Discussion · Next Topic » |


12:53 PM Jul 11