| Snarky Muse is a multi-genre roleplaying site with a name inspired by my own jerk of a muse--you probably either know him or one just like him. Click for more... |
| How Acceptance floor construction laying? | |
|---|---|
| Tweet Topic Started: Feb 26 2016, 02:33 AM (69 Views) | |
| meishengchao | Feb 26 2016, 02:33 AM Post #1 |
|
Here are some wood flooring construction inspection methods: 1, wood flooring material variety, grade meet the design requirements, the moisture content should be around 10, intraoperative keel laying skids before acceptance if made embalmed, to install a solid wood keel, straight, spacing and fixation methods in line with regulatory requirements , the board nail shop solid, no loose, solid paste, without hollowing, use plastic varieties meet regulatory requirements. 2, visual inspection of the laying of wooden floor surface planing, polishing, no scars, stubble clear Russia and burrs, pattern, color consistent surface edible vegetable oil, lay in the right direction, the surface layer tight joints, joints staggered position, clean surface. Laying skirting board joints tight, smooth, consistent height and out of the wall thickness. With 2 meters by foot inspection, floor coverings flatness error of less than 1 mm, slit width less than 0.3 mm ,, foot catchy lay flatness error of less than 3 mm, patchwork flatness error of less than 2 mm. Laying wood floor construction quality problems and treatment methods: 1, wooden flooring common quality problems are hollowing sound when walking, laying an uneven surface, patchwork lax, local Alice drums. (1) there is hollowing sound: The reason is not solid wood flooring fixed due mainly wool board and keel, gross floor plate and a small number of nails or staples too strong, sometimes because of the contraction caused by changes in the moisture content of the sheet or plastic solution failed due. Control methods in addition to strict inspection sheet moisture content, adhesive, such as quality, after passing inspection before use, nails should not be too small when installed outside, and shall ensure that nailed, each finished laying a wooden floor, with no sound after the test foot hold one, if the sound should immediately rework. (2) the laying of surface irregularities: The main reason is the laying of the grass-roots or uneven wood floor deforms due to bagging. In laying the construction, application and acceptance level of foot, keel leveling the surface, if uneven laying skids should be adjusted. Ventilation should be done on a small groove keel. Laying plate margins should stay out of the wall 10 mm ventilation gap. Thermal insulation layer material must be dried to prevent postoperative damp floor bagging. Wood floor surface flatness error should be within 1 mm. (3) patchwork lax: In addition to the laying of non-standard construction, the difference between the width of the size error and tongue and groove processing quality sheet is also an important reason, in addition to carefully examine the construction quality of the floor, the installation should inro plum Tiling in the front plate nail cramp, with the floor module slot die was unanimously after nailing. (4) Local Alice Drum: In addition to the main reason for the board to damp deformation, there are too small or seamless patchwork wool board, the use of water pipes leaking bubble wet floor caused. To stay 3 mm gap when installing wool board in construction, carved wood keel ventilation slots. After floor coverings, floor brushing paint film should be complete, daily use to prevent water flowing into the lower portion of the floor, to clean up the water surface layer. Wood floor construction schedule estimates: Wooden flooring is highly technical projects, and other items should not be parallel operation. Usually takes a week to complete the construction tasks Sanshiliangting, wherein wood keel installation and grassroots moisture treatment two days, two days wool board and floor installation, floor surface planed polished day, floor paint brushing two days. Real laying of empty shop law than less labor, floor size large than small size of the province, slower than drying floor paint dry elements, specific time should be determined according to the construction methods, materials, and other products. In the acceptance process must be borne in mind that several criteria, our lives do not leave blemishes. all link: Plastic Wood Effect Gravel Boards attaching wood fence to concrete wall |
|
|
| 1 user reading this topic (1 Guest and 0 Anonymous) | |
| « Previous Topic · General Discussion · Next Topic » |


1:01 PM Jul 11