| Snarky Muse is a multi-genre roleplaying site with a name inspired by my own jerk of a muse--you probably either know him or one just like him. Click for more... |
| How potting road construction | |
|---|---|
| Tweet Topic Started: Jul 21 2016, 02:20 AM (48 Views) | |
| qzz10011 | Jul 21 2016, 02:20 AM Post #1 |
|
<p> Construction technology on pavement pouring glue mainly include slotted, clear joints, pouring. Of course, three simple looks simple, but the details of which aspects need attention. mainly include: Clean seam. </P> <P> First, with clear saw clear sew seams of sand, mud coagulation, greater than 0.5mpa use compressed air, the elimination of seams dust and other contaminants to ensure clean and dry joints and internal wall, wall joints checks to wipe dust is not pouring criteria. </P> <P> Taping. Both sides of the seam taped to prevent pollution pouring glue overflow pavement. Ingredients from full-time staff according to technical requirements and the ratio of ingredients, mix well. Pouring can not be filled once, 2-3 times. </ P> <P> Zhaobu on the site have not filled Zhaobu personnel Zhaobu. Clean up the site, and other coagulation after pouring glue for the excess overflow To clear the road to keep clean. </ P> <P> Construction period negotiated by the two sides A and B requires staffing and adjust the speed of construction. Construction quality construction standards in strict accordance with the Ministry of Transportation road construction. </ P> <p>Related Sites:<br /> <a href="http://roadcuttingmachine.com/blog/365.html">forward asphalt plate compactor</a><br /> <a href="http://roadcuttingmachine.com/blog/60.html">Mobile hot air lance</a><br /> <a href="http://roadcuttingmachine.com/blog/487.html">cold mix bitumen repair material</a><br /> <a href="http://roadcuttingmachine.com/blog/448.html">hydraulic reversible plate compactor</a> </p> |
|
|
| 1 user reading this topic (1 Guest and 0 Anonymous) | |
| « Previous Topic · General Discussion · Next Topic » |


8:43 AM Jul 11