| Outdoor floor construction procedures and routine maintenance | |
|---|---|
| Tweet Topic Started: Oct 10 2016, 11:55 PM (52 Views) | |
| qzz10011 | Oct 10 2016, 11:55 PM Post #1 |
|
<p>1. Construction conditions: Before the construction of outdoor wood construction must be completed and to be clean, the quality of the ground construction must meet the design requirements of architectural drawings.contemporary garden fencing <a href="http://externalfloor.com/product/4449.html">stair options for decks</a> Decorative lighting and other may affect the outdoor wood works to wait until after the end of its construction to avoid cross-construction of outdoor wood construction and maintenance impact;</p> <p>2. keel to take the suspension laying method: the keel in the base plane can be connected into a framework / frame structure, and then laying outdoor floor; basic keel spacing is generally horizontal and vertical 30-50CM (determined by the outdoor floor thickness), keel spacing The height of more than 50cm, the foundation must be further reinforced (angle or stakes, the other);product from wood plastic composite <a href="http://externalfloor.com/product/5440.html">vinyl fence cheap</a> part of the wooden structure, if necessary, should also be done drainage treatment: such as wood keel Wood keel according to customer requirements brush fire retardant coating (price extra); (preservative wood keel installation diagram and notes separate note)</p> <p>3. Floor installation: the installation of outdoor flooring, wood to be left between the gap 0.2-1CM (according to the wood moisture content and then determine the gap size, wood moisture content of more than 30% should not exceed 0.8CM as well) to avoid the rain product Water and wood expansion;<a href="http://externalfloor.com/product/5626.html">wood plastic patio</a> outdoor flooring thailand floor interface must be flat, the other should be rounded treatment, so that no significant level difference, no obvious loosening, the overall laying of flat solid;</p> |
|
|
| 1 user reading this topic (1 Guest and 0 Anonymous) | |
| « Previous Topic · General Discussion · Next Topic » |


1:30 PM Jul 11